The Manifold Pack System is catered to the kitchen and laundry area of the convention center, comprising a total of ten 26lt Rinnai Infinity Internal Gas Water Heater units affixed to the wall. The installation enabled the venue to free up 70% of operational space that was previously taken up by the traditional boiler system.