HOME » ENGINEERING » CASE STUDY » The Tun Hussein Onn National Eye Hospital  
 
The Tun Hussein Onn National Eye Hospital

 

The Tun Hussein Onn National Eye Hospital
 Capacity : 6000 ltr/hr @ 60 deg C
 System : Manifold pack of 4 Rinnai Infinity 26
               - MECS System (On Demand System)
               - Power Flue System
 Floor Space : 70% lesser compare to previous design

 
 
" The operator is experiencing 50% reduction on their monthly LPG bills "